| CRIVITZ HOUSE PROJECT | LAST UPDATED ON 6-29=08 |
![]() |
HERE IS THE FINISHED LOG DECK, STILL NEEDS STAINING |
| DECK SIDE VIEW |
![]() |
![]() |
FROM ON TOP DECK |
| DECK WITH BOTTOM
FINISHED AND NEW WALK PATH TO FRONT STEPS
|
![]() |
![]() |
FRONT PART OF HOUSE SANDED
AND WASHED
|
| STAIRCASE LOCATION IN THE
HOUSE WHERE NEW STAIRS WILL BE GOING, I USED THE OLD STAIRCASE TO GET AN
IDEA OF HOW IT WOULD FIT
|
![]() |
![]() |
BACK OF HOUSE SANDED AND
WASHED
|
| FIREPLACE SIDE OF HOUSE SANDED AND WASHED | ![]() |
![]() |
BACK AND SIDE OF HOUSE
SANDED AND WASHED
|
| FIRST COAT OF STAIN PUT ON
FRONT OF HOUSE AND SANDED SIDE OF HOUSE
|
![]() |
![]() |
BACK AND SIDE OF HOUSE SANDED AND WASHED |
| SIDE OF HOUSE WITH TWO COATS OF STAIN | ![]() |
![]() |
BACK OF HOUSE WITH TWO COATS OF STAIN AND SOME REPAIRED CHINKING |
| FRONT OF HOUSE WITH TWO COATS OF STAIN | ![]() |
![]() |
FRONT OF HOUSE WITH TWO COATS OF STAIN |
| SIDE OF HOUSE WITH TWO COATS OF STAIN | ![]() |
![]() |
![]() |
| FRONT DOOR WITH 1 COAT OF STAIN | FRONT DOOR BEFORE 1 COAT OF STAIN |
![]() |
![]() |
| BACK OF HOUSE WITH TWO COATS OF STAIN AND CHINKING FINISHED | BACK OF HOUSE WITH TWO COATS OF STAIN AND CHINKING FINISHED |
![]() |
![]() |
| CORNER OF HOUSE WITH 1/2 ROTTED LOG END CAP | BACK OF HOUSE WITH 1/2 ROTTED LOG 18' |
![]() |
![]() |
| KITCHEN FLOOR WITH TILES TORN UP | Half Log Cleaned out of all rotted wood, ready for new log |
![]() |
|
| Front Fence Sanded with house with finished Chinking in Background | |
![]() |
|
| Front Fence Sanded before stain | |
![]() |
New half log put on |
| New half log put on, different angle |
![]() |
![]() |
New walk path front of house |
| front of house finished | ![]() |
![]() |
front and side of house finished |
| east back corner of house
back deck has 1 coat of stain needs one more |
![]() |
![]() |
New half log put on, close up |
| New half log put on, and
new end cap
end cap is fully stained, log has only first coat |
![]() |
![]() |
back corner of house |
| walk path to back steps
will
finish like front walk |
![]() |
![]() |
west side of house new paint on basement and other windows all new chinking done |
| side and front of house,
all that's left is fill in the walk path |
![]() |
![]() |
Front of house finished |
| New finish on fence and mailbox post | ![]() |
![]() |
house from drive entrance, little dark it was getting late |
| Front porch finished stain | ![]() |
![]() |
New walk path front of house and front porch finished stained |
| New walk path front of house | ![]() |
![]() |
New walk path front of house |
| New walk path front of house | ![]() |
![]() |
New finish put on one front door |
| house doors sanded ready for finish | ![]() |